1. Loads
List each device, running watts, startup surge and hours per day.
LITHVOLT LITHIUM ACADEMY
A practical, application-led guide for choosing battery energy, voltage, inverter power, solar charging and protection. Start with your loads—not a product name.
START WITH 6 INPUTS →01 / INPUTS
Collect these inputs before comparing batteries. Missing one can create an undersized inverter, slow charging or unsafe DC current.
List each device, running watts, startup surge and hours per day.
Define hours or days without grid, engine or solar charging.
Grid, alternator, generator and available solar roof/ground area.
Required DC voltage, AC voltage, frequency and phase.
Temperature, water/dust exposure, vibration, altitude and ventilation.
Space, weight, connectors, communications, destination and quantity.
02 / CALCULATOR
Use this for a first estimate. Final cable, fuse, BMS and equipment settings must follow the exact component manuals and local code.
Daily energy
3.00 kWhMinimum nominal battery
4.17 kWhBattery capacity
326 AhEstimated solar energy/day
2.02 kWhSolar recovery time
9.3 hPlanning method: load × time; battery size includes usable-depth and efficiency allowances. Solar output includes a 75% planning factor for conversion and field losses.
Wh = watts × hours. Battery nominal Wh = volts × amp-hours.
hours ≈ nominal Wh × usable depth × efficiency ÷ load W.
amps ≈ AC watts ÷ (battery volts × inverter efficiency). Higher system voltage reduces current.
daily Wh ≈ array W × peak-sun-hours × 0.75. Use site-specific data for final design.
03 / RV
RV body size alone does not determine the battery. Appliance list, simultaneous load, air conditioning, roof area and alternator capability matter more.
| Use profile | Battery energy | Inverter | Solar | Typical loads |
|---|---|---|---|---|
| Van / light camper | 0.8–1.6 kWh | 1–2 kW | 200–400 W | Lighting, fan, router, laptop, small fridge |
| Towable / medium RV | 2.5–5.1 kWh | 2–3 kW | 400–800 W | Daily essentials, microwave in short bursts, coffee maker |
| Large motorhome | 5.1–10.2 kWh | 3–5 kW | 800–1,600 W | Multiple appliances and limited air-conditioning runtime |
| Long-stay / high load | 10–20 kWh+ | 5–8 kW | 1–2 kW+ | Extended off-grid use; requires a full thermal and charging study |
Approximate 10–100% times shown below include a 10–25% allowance for taper and losses. The battery/BMS maximum charge current is always the limit.
| Battery | Energy | Standard charge | Fast charge | Solar planning |
|---|---|---|---|---|
| 12.8 V 100 Ah | 1.28 kWh | 20 A ≈ 5–6 h | 40 A ≈ 2.8–3.3 h | 400 W solar ≈ 4–6 sun h |
| 12.8 V 200 Ah | 2.56 kWh | 20 A ≈ 10–12 h | 40 A ≈ 5.5–6.5 h | 600 W solar ≈ 5–7 sun h |
| 25.6 V 200 Ah | 5.12 kWh | 40 A ≈ 5.5–6.5 h | 80 A ≈ 2.8–3.3 h | 1 kW solar ≈ 6–8 sun h |
| 51.2 V 100 Ah | 5.12 kWh | 50 A ≈ 2.2–2.6 h | 100 A ≈ 1.1–1.4 h | 1 kW solar ≈ 6–8 sun h |
04 / SOLAR + MPPT
Panel wattage is its rated peak under standard test conditions. Real energy depends on location, orientation, temperature, shade and system losses.
Rated maximum power. Use it to total array size, not as guaranteed continuous output.
Voltage and current at maximum power. Their product is approximately Pmax.
Open-circuit voltage and short-circuit current. These set controller safety limits.
Power per panel area. Higher efficiency helps when roof space is limited.
Voc rises in cold weather; power usually falls as cells get hotter.
Can collect rear-side light when mounting and surface reflectance allow it.
Adds voltage; current stays similar. Cold-corrected total Voc must remain below the MPPT absolute limit.
Adds current; voltage stays similar. Check controller input current, connector and combiner/fuse requirements.
Best general choice for variable solar voltage. Its output current is roughly array watts ÷ charging voltage; retain engineering headroom.
Suitable only for small, voltage-matched systems where lower harvest and limited flexibility are acceptable.
Avoid mixing different Vmp/Imp in one string. If shading or orientations differ, use separate MPPT inputs/controllers.
Use the battery maker’s charge voltage, current and temperature limits; enable low-temperature charge protection for LFP.
05 / HOME STORAGE
Begin with 12 months of bills or a measured load profile. Separate “energy per day” from “instantaneous power” and decide which circuits truly require backup.
| Profile | Daily use | Battery | Inverter | Outcome |
|---|---|---|---|---|
| Essential backup | 3–8 kWh/day | 5–10 kWh | 3–5 kW | Lights, router, fridge, electronics |
| Typical home | 8–18 kWh/day | 10–20 kWh | 5–8 kW | Essential circuits plus selected kitchen/office loads |
| Large / electric home | 18–35 kWh/day | 20–40 kWh | 8–15 kW | High simultaneous loads; split-phase/three-phase study |
| Weak-grid / off-grid | Measured load × autonomy | 2–3 days reserve | Peak + motor surge | Add generator or controlled load shedding |
Keep engine-start and house/trolling banks separated unless the approved architecture explicitly combines them.
Trolling motors commonly use 12, 24 or 36 V. Match nameplate voltage and verify maximum current against BMS, cable and breaker.
Runtime ≈ usable Wh ÷ average motor watts. Propeller, hull, wind, current and speed can change consumption sharply.
Use shore, alternator or solar chargers with an LFP profile and galvanic/corrosion-aware marine installation.
Secure the battery against movement; use protected terminals, suitable enclosure/IP level, ventilation and ignition requirements for the compartment.
Navigation, bilge, communications and engine starting should not depend on one unprotected consumer circuit.
Match the existing 36/48/72 V controller and charger. Never substitute a different nominal voltage because the connector fits.
BMS continuous and peak current must cover controller demand, hill starts, passengers and accessories without nuisance trips.
Range depends on usable kWh, vehicle mass, tires, speed, terrain and temperature; validate with a route test.
Measure tray, hold-downs, terminal clearance and axle loading. A conversion may need a new mounting kit and state-of-charge display.
Use an LFP-compatible charger with correct pack voltage and communication/interlock behavior.
Size around the longest duty cycle and available overnight/shift charging window, then keep reserve for aging and cold.
Phones, router, lights, camera and a laptop; not heating appliances.
Mobile office, TV, CPAP and efficient fridge; short bursts of kitchen loads if surge allows.
Longer backup and heavier appliances; weight and recharge time become decisive.
Treat as a wheeled/modular energy system with dedicated protection and transport planning.
Verify AC voltage/frequency, USB-C PD rating, regulated DC output and solar input voltage/current window.
Use measured appliance energy when possible. Compressors cycle; heaters draw near nameplate continuously.
LithVolt technical library
A practical checklist for matching LiFePO4 batteries with hybrid and off-grid inverters.
How installers should compare architecture, current, expansion, service and inverter choice.
Understand transport testing and industrial battery safety evidence before requesting documents.
A buyer-focused audit framework for engineering, traceability, process control and after-sales readiness.
A stage-gate path for private-label and custom battery projects.
Why matching the plug is not enough for a safe battery–inverter integration.
A practical framework for brands, importers and distributors to organise evidence before market entry.
The exact cell/battery design must meet applicable UN 38.3 requirements; packing, labels, state of charge and paperwork depend on mode and configuration.
IEC 62619 covers safety for industrial lithium cells and batteries, including stationary, golf-cart and marine examples; end-use rules still apply.
North American projects may require evaluated batteries, inverters and the complete system under standards such as UL 1973, UL 1741 and UL 9540; local fire/electrical code controls installation.
Requirements differ by product architecture and market. Confirm battery, charger, EMC, radio and mains safety for the exact model and destination.
Educational planning guidance—not a final electrical design, compliance declaration or installation instruction. Local rules and exact manufacturer data take precedence.