01
Brief
Define measurable electrical, mechanical, environmental and market requirements.
Technical resource
Successful OEM work is a sequence of decisions: requirement baseline, feasibility, engineering release, sample verification, pilot build and controlled production. Skipping a gate transfers hidden risk into field failures and warranty disputes.

Evidence before promises
Reference guidance only. Final specifications, compatibility, certifications and market obligations are confirmed for the exact model and destination.
Configuration review
01
Define measurable electrical, mechanical, environmental and market requirements.
02
Freeze drawings, BOM, firmware, test limits, labels and documents.
03
Build with production tools and review yield plus deviations.
04
Use incoming control, line records, final tests and approved change procedure.
What we confirm before quoting
What LithVolt can support
Battery PACK engineering and assembly, matched inverters and chargers, solar and protection components, documentation coordination, pilot builds and export delivery. Cell and accessory sources are disclosed and controlled per project where relevant.
PACK
GLOBAL
EVIDENCE
1
Application, load, environment, destination and commercial target.
2
Battery architecture, BMS, interfaces and surrounding products.
3
Exact-model evidence, sample test plan and acceptance points.
4
Controlled production, packing, logistics and support handover.
Send the voltage, power, runtime, dimensions, quantity and destination. We will identify what can be configured now and what must still be tested or confirmed.